Concrete Floors - Radiant Heating

  • Created

In-ground heating should be turned off 2 days prior to application of our concrete floor coatings to allow the concrete temperature to normalize. It should remain off for 7 days after application.

Was this article helpful?

1 out of 1 found this helpful